→ QUALITY & METROLOGY • REPORTS • AS9102

FAI & CPK Inspection — First Article Reports & Process Capability

JYH Prototype provides First Article Inspection (FAI) and CPK process-capability studies for CNC machined and injection molded parts. Every first article is measured against the full drawing — all dimensions, tolerances and material requirements — and documented in AS9102 Form 1, 2 and 3 reports, with Cpk values proving the process can hold your tolerances in production, not just once.

AS9102 First Article Inspection report with machined part and drawings AS9102 FAI Reports
AS9102 Forms 1–3 Included
Cpk Capability Studies
Ballooned Drawings Included
AS9102
Forms 1, 2 & 3 FAI Reports
Cpk ≥1.33
Standard Capability Target
100%
Drawing Characteristics Measured

What Is a First Article Inspection (FAI)?

A First Article Inspection is a complete verification of the first parts produced from a new setup, tool or design revision. Every characteristic on the drawing — dimensions, tolerances, materials, finishes and certifications — is measured and recorded, proving the production process makes exactly the part the drawing describes before volume production begins.

JYH documents FAI to the AS9102 standard used by aerospace and regulated industries: Form 1 (part number accountability), Form 2 (product accountability — materials and processes) and Form 3 (characteristic accountability — every measured result).

Inspectors performing final dimensional and visual checks at inspection benches
Final Inspection Benches — Dimensional and Visual Verification of Every Batch

What Is CPK and Why Does It Matter?

Cpk measures how consistently a process holds a tolerance over many parts, not just the first one. A Cpk of 1.33 means the process spread fits inside the tolerance band with margin; 1.67 is required for safety-critical characteristics in automotive and aerospace programs. JYH runs CPK studies on your critical dimensions during pilot and production runs, so a passing FAI is backed by statistical proof the thousandth part will match the first.

JYH CMM laboratory performing full-dimensional FAI measurement
CMM Laboratory — Full-Dimensional Measurement for FAI & CPK Studies

When Do You Need FAI & CPK Documentation?

Most regulated and high-reliability programs require formal FAI and capability evidence before production release:

  • Aerospace, medical and automotive supplier qualification
  • New part introduction and design revisions
  • Transferring production to a new supplier or tool
  • Customer or regulatory audit requirements (AS9102, PPAP)
Deliverables

What You Receive

  • Ballooned engineering drawing
  • AS9102 Form 1, 2 & 3 report
  • Raw CMM measurement data
  • Cpk capability study on critical dimensions
  • Material & process certificates (Form 2)
FAQs

Frequently Asked Questions

What is included in an FAI report?

A complete AS9102 FAI package contains Form 1 (part number accountability), Form 2 (product accountability — material and process certifications) and Form 3 (characteristic accountability — every drawing dimension measured and recorded), plus a ballooned drawing that maps each result to its callout.

How many parts are measured for a First Article Inspection?

Typically one to three first articles produced from the final production setup are fully measured. For capability studies, a larger sample — commonly 30 or more consecutive parts — is measured on the critical dimensions to calculate Cpk.

What Cpk value should I require?

Cpk ≥1.33 is the common minimum for production characteristics, and ≥1.67 for safety-critical or special characteristics in automotive and aerospace programs. JYH reports the actual Cpk for every studied dimension so your quality team can judge the margin directly.

How long does an FAI take?

A standard FAI package is completed within 24–48 hours of first-article production, including CMM measurement, ballooned drawing and the AS9102 forms. CPK studies add sampling time during the pilot or production run itself.

Do you provide FAI for injection molded parts as well?

Yes. FAI and CPK documentation covers both CNC machined and injection molded parts, including T1/T2 tool-trial samples, so molded production is released against the same evidence standard as machined parts.

Ready to Prove Your Parts Meet Specification?

Upload your CAD and drawings for an instant quote — inspection, FAI and material documentation are built into every JYH production order.

💬

Connect on WeChat

Scan the QR code or search WeChat ID to speak directly with our Shenzhen engineering team.

WeChat ID: JYH-Prototype
JYH AI Assistant · 智能客服
Online 24/7 · 全天在线
Get Instant Quote
Shenzhen High-Tech Industrial Park
+86 137 1457 8126