Rapid Bridge Tooling: Production Parts in 7 to 14 Days
The Agile Bridge Between CAD Prototypes and High-Volume Steel Dies
When functional testing requires real injection molded resins rather than 3D prints, our rapid tooling process delivers molds in as fast as 7 business days. Using high-strength aircraft aluminum (Alumold / QC-10) and standardized Master Unit Die (MUD) bases, we machine mold cores and cavities via high-speed CNC and wire EDM, slashing tooling investment by up to 70% compared to traditional tooling.
- Pre-machined MUD mold bases drastically cutting steel prep time and tooling costs
- Genuine production-grade thermoplastics with isotropic strength and true shrink rates
- Ideal for clinical trials, pilot hardware testing, and bridge-to-market production
