Rigorous 5-Stage Quality Management Architecture
From Mill Test Certificate Verification to Final Packout Audit
At Shenzhen Jinyihe Technology, ISO 9001:2015 is not merely a wall plaque; it is the algorithmic operating system of our factory floor. Our Quality Assurance protocol divides every production order into five gated inspection stages: Incoming Material Verification (IQC) with optical emission spectroscopy, First Article Inspection (FAI) after setup, In-Process Quality Control (IPQC) automated sampling every 2 hours, Outgoing Quality Control (OQC) 100% dimensional check, and Pre-Shipment Inspection (PSI) validating vacuum anti-corrosion packaging. This eliminates scrap and guarantees that every shipment is 100% in-spec.
- Material verification via handheld XRF alloy analyzers before cutting metal
- Automated tool wear compensation sensors to prevent tolerance drift during CNC runs
- Digital MES quality logs accessible to overseas clients via encrypted portal
